The construction of the Bank’s latest office building, Menara Public Bank 2 at No. 78 Jalan Raja Chulan, 50200 Kuala Lumpur has completed with CCC issued on 2 January 2017.
PBB Jalan Raja Chulan Branch and the Public Mutual Head Office will soon be relocated to this new building and in total, both entities will occupy about 50% of the lettable floor
space.
The remaining floor space will be available for leasing. The pertinent details of the Building are as follows:
Size (sq ft) | Floor | Description | Rental (RM/psf) |
3000 | Various | Bare Unit | |
6000 | Various | Bare Unit | |
12000 | Various | Bare Unit | |
24000 | Various | Bare Unit | |
48000 | Various | Bare Unit |
Description of Building : 40-Storey Grade A Green Office Building accorded precertification, Gold rating by both Leader In Energy & Environmental Design (LEED) under US Green Building Council and Green Building Index (GBI) under the Malaysia
Green Building Confederation
Available Floor : 23rd to 38th Floor (including penthouse floor)
Typical Area Per Floor : Approximately 13,000 sq ft
Parking Facilities : 6 basement car park with 721 car parking bays, 124
motorcycle parking bays and 83 bicycle parking racks
Occupancy : Immediate
Key Salient Points
Located in Golden Triangle
Prestigious business address
Green Building with LEED Gold and GBI Gold
Banking facilities
Dual entrances
Complete with computer points, power points, fibre optic backbone
cabling
Quadruple-volume grand lobby with luxury finishes
Raised Floor System
Under-floor air-conditioning system
Excellent views
Vehicle parking
721 car parking bays
124 motorcycle parking bays
83 bicycle parking racks
Facades
Double glazing low-emissivity glass for optimum heat and sound
Insulation
Floor-to-Ceiling Height
2.8 meters (floor finishes to ceiling)
Office Floor Loading Capacity
Live load: 3,500 N/m2
Partition : 1,000 N/m2 lightweight partition
Floor System
Raised floor system for total cabling flexibility
Air conditioning
System
A/C system : Chilled water system
A/C control system
Podium (Level 2 – 4) : VAV system
Typical office(Level6-38) : Raised floor system plenum air
conditioning system
Operating Hours : 8.30 am – 5.30 pm (Monday – Friday)
Electrical System
Power Supply : 2 nos 150A supply per floor
Essential Supply : 40A three-phase provision at riser upon request
Power Distribution : Trunking distribution under raised floor
Telecom System
Telco System : 2MDF rooms provision
Voice Comm : 2 nos 12 pairs incoming telephone multipairs per Floor
Data Comm : 2 nos 8-core incoming fiber optic per floor
Horizontal Distribution : RJ45 outlets with Cat6 raised floor distribution
Lifts
Low Zone : 8 dedicated lifts
High Zone : 8 dedicated lifts
Car Park : 3 lifts
Bomba : 2 lifts
© 2019 Ceo Tower All rights reserved